La Cumbre Plaza Macy's Redevelopment: What the Hearing Can Change

If you've parked outside Macy's at La Cumbre Plaza lately, you may have asked how much of the plan for that building is still undecided. On Monday, November 9, the city's Staff Hearing Officer and Architectural Board of Review hold a special joint hearing on "The Neighborhood at State & Hope," a 680-unit rental project planned for the Macy's site at 3805 State St. and 110 S. Hope Ave. Noozhawk reported the hearing on Oct. 23.

State housing law gives the city little room to cut the number of homes if the project meets the city's objective standards. Most of what the officer and the board can still shape is what neighbors will walk past, including the buildings, the plazas, the trees, the driveways and the bus stop on State Street.

The Rules Were Set Before the Design Was Finished

The project went through several unit counts on the way to Monday. In December 2022, the Santa Barbara Independent reported a 685-unit plan. A January 2024 version had 642 units. Noozhawk reported 689 units in January 2025 and 684 that April. The November 9 agenda lists 680.

The agenda also lays out the rules that limit the city's options. The project uses the city's Average Unit-Size Density Incentive Program and the State Density Bonus Law. On October 25, 2023, the developers filed an SB 330 preliminary application, which locked in the development standards and fees in effect on that date. The agenda then cites state Government Code Section 65589.5(j). Under that section, if the subdivision meets the city's objective standards, the city may not deny it or attach conditions that would reduce the project's density.

The environmental review question is mostly settled too. The city's project page says AB 130, which took effect June 30, 2025, created a statutory CEQA exemption for qualifying housing projects, and the city found that this project qualifies, subject to conditions tied to General Plan consistency. The same page says the City Council authorized talks on a development agreement in August 2024 and no agreement was reached.

Two Panels, Four Decisions

Monday's meeting combines two separate reviews. The agenda divides the work this way:

  • Staff Hearing Officer. Decides on the Tentative Subdivision Map. Makes "No Net Loss" findings confirming the city's Housing Element still has room for its remaining state housing targets at each income level. Determines whether the project is statutorily exempt from CEQA under Public Resources Code Section 21080.66.
  • Architectural Board of Review. Decides on Project Design Approval for the new buildings and the exterior changes to the existing shopping center.

The design board measures the project against the Upper State Street Design Guidelines, its own general guidelines, and the city's outdoor lighting and streetlight guidelines. The agenda adds a limit: the board cannot use its non-objective compatibility findings to reject the project or reduce its density, and state law requires the city to apply its standards in a way that "facilitates and accommodates development at the permitted density."

Within those limits, the design board reviews how six buildings ranging from two to six stories line up along State Street and Hope Avenue, and what the public spaces between them look like.

What the Plans Put on the Corner

The agenda's project description goes beyond the unit count. Several of its details affect anyone who drives, bikes or catches a bus near State and Hope:

Element What the November 9 agenda lists
Building removed Macy's, about 141,440 net square feet
Homes 680 rentals: 94 studios, 383 one-bedrooms, 186 two-bedrooms, 17 three-bedrooms
Income-restricted homes 39 very-low-income, 15 moderate-income
Commercial space About 27,947 net square feet
Open space and plazas About 60,916 square feet, plus a 36,327-square-foot residents' yard
Car parking 817 residential, 107 commercial, 3 guest, 12 loading spaces
Bike parking About 715 long-term residential spaces, 39 commercial spaces
Trees 137 on site and 14 street trees removed, with new trees planted
Construction One phase

Residential parking would sit on two underground levels, and two ground-level garages would serve the shops. The plan moves the State Street bus stop just east of Hope Avenue so it sits beside the new development. It also adds or improves sidewalks, walkways and bike lanes across the site and changes several existing driveways. The plan calls for about 97,100 cubic yards of cut and 24,500 cubic yards of fill. The new apartments would be all-electric, and construction equipment would have to meet the EPA's Tier 4 Final emission standards.

The owner listed on the agenda is Matthew Taylor of MCP Santa Barbara LLC. The applicant is Gelaré Macon of Flowers & Associates, Inc. The applicant's project site describes public paseos, local shops, eateries and a restaurant.

The Half of the Plaza That Stays Put

The subdivision map is the decision that most affects everyday shopping at La Cumbre. Today the plaza is one legal lot of 14.9 acres. The map would split off 8.8 acres for the new project and leave a 6.1-acre lot where the existing buildings remain. Noozhawk reported that Bristol Farms and other restaurants and stores on the remaining side of the mall would stay. The La Cumbre directory still lists Bristol Farms, Lure Fish House, Mendocino Farms, Chipotle, Panda Express, Starbucks and Wingstop.

Macy's is on that directory too, and the retailer's own store locator lists the La Cumbre store as open. In January 2025, Noozhawk reported that the store's lease runs through 2028 and that the building could come down once the lease ends. The same story cited a city historic resources report that found the three-story building, built in 1967, ineligible for landmark designation. So even if both panels approve the project on Monday, the next step listed on the city's project page is applying for building permits.

The Sears Side Is Moving More Slowly

The Macy's site is one of two housing proposals at La Cumbre. The former Sears building has its own plan, La Cumbre South Homes, with 443 rental units in two four-story buildings. Noozhawk identified Kennedy Wilson as the developer. When that project reached the Architectural Board of Review for concept review on November 10, 2025, the Independent reported that the board was not satisfied and continued it indefinitely. In its May 2025 project description, the applicant forecast that demolition and site work would begin in January 2028.

Together, the two proposals cover 1,123 apartments planned across the north and south ends of the same shopping center. Almost a year apart, both have come before the same design board, and the Macy's project is the first to reach a decision hearing.

The Question Neighbors Keep Raising

Traffic has been the most common concern since the developers held their first open house. KEYT reported that hundreds of people attended that January 2024 event. Some nearby residents objected to the parking and traffic plans, one preferred for-sale condos to rentals, and another supported putting housing where the shopping center sat largely empty.

The written comments filed for Monday's hearing focus on the same corner. A Hope Ranch resident asked how the city would address State Street traffic that is already slow. Another commenter described the Hope Avenue and State Street intersection and the nearby freeway exit as congested and sometimes dangerous for pedestrians. Those concerns fall within the design board's review, which covers the driveways, the sidewalks and the relocated bus stop.

Taking Part in Monday's Hearing

The meeting starts at 3:00 p.m. in the David Gebhard Public Meeting Room at 630 Garden Street. According to the agenda:

  1. Email written comments to [email protected] or [email protected]. Comments that arrive after 9:00 a.m. on the day of the meeting may not be reviewed in time. Mailed comments go to SHO Secretary, PO Box 1990, Santa Barbara, CA 93102-1990.
  2. To speak remotely, join the Zoom webinar or call in using the details printed in the agenda.

Any questions about the project itself go to Megan Arciniega, the city's Development Review Supervisor, at [email protected]. Most of the plans aren't posted online. You can view them during walk-in hours at the Community Development Department, 630 Garden Street, with no appointment needed.

If you own a home near Upper State Street and want to talk through what a 680-unit neighbor at State and Hope could mean for your property over the next few years, Ally Edwards can walk you through it. Get Your Free Home Valuation.

Experience the Difference

I am committed to guiding you every step of the way—whether you're buying a home, selling a property, or securing a mortgage. Whatever your needs, I've got you covered.

Follow Me on Instagram